![](/rp/kFAqShRrnkQMbH6NYLBYoJ3lq9s.png)
North Sea portfolio | Where we operate | Home - bp
The bridge-linked platforms, which delivered first oil in November 2018, are designed to recover an estimated 640 million barrels of oil. bp and partners are now considering options to unlock future energy potential from the Clair field through a third phase of development. In 2022, bp, along with other west of Shetland operators, signed a ...
Clair oilfield - Wikipedia
The Clair oilfield is an offshore oil field in Scottish territorial waters 75 kilometres (47 mi) west of Shetland in water depths of up to 140 metres (460 ft). The field is the largest oilfield on the UK Continental Shelf with an estimated 8 billion barrels of oil …
BP starts-up Clair Ridge production | News and insights | Home
Nov 23, 2018 · Two new, bridge-linked platforms and oil and gas export pipelines have been constructed as part of the Clair Ridge project. The new facilities, which required capital investment in excess of £4.5 billion, are designed for 40 years of production.
Clair field Location: 75km west of Shetland Area: 220km2, covering 5 licence blocks Depth of water: approximately 140m Windspeeds: up to 120 knots (140mph) Wave height: up to 25m design life, supporting employment for decades to come of UK jobs created through project phase project contracts delivered in the UK
bp assessing options for third Clair Field project west of
Mar 7, 2024 · LONDON — bp is working on plans for Phase 3 of development for the giant Clair oil field west of Shetland in UK waters, according to partner Harbour Energy’s latest results statement. Clair Phase 3 will likely target Clair South, one of the UK’s largest remaining undeveloped offshore accumulations.
Clair Ridge Development Project, North Sea - One of the key assets of BP
Dec 4, 2018 · BP uses its LoSal oil recovery technology at Clair Ridge for reducing salinity in the water injection systems in order to improve the oil recovery. The oil produced by the Clair Ridge production platform is sent via a 5.5km-long and 22in-diameter new oil export pipeline connecting the existing oil export pipeline of the Clair phase one project.
Clair Ridge Project, Shetlands - Offshore Technology
Apr 30, 2021 · Clair Ridge is the first large-scale project to implement BP’s patented LoSal enhanced oil recovery (EOR) system, which was successfully tested at the Endicott field. The technology will alter the salinity of water injected into the reservoirs and increase oil recovery.
BP's Mega Offshore Platform Phase 2 Startup - Oil Gas Life
The Clair Ridge platform is now producing oil from the giant Clair field – a massive oil reservoir discovered in 1977. Geologist Bill Senior, who was part of the original discovery team, remembers those early days west of Shetland.
BP produces first oil from major North Sea development
Nov 23, 2018 · Two new, bridge-linked platforms and oil and gas export pipelines have been constructed as part of the Clair Ridge project. According to BP, the partners invested more than £4.5 billion in the new offshore facilities, designed for 40 years of production.
BP starts production at Clair Ridge oil field
Dec 4, 2018 · It is designed to recover 640m bbl of oil and is aiming for a peak production of 120,000 bbl/d which will supply 10% of the UK’s oil. It consists of two bridge-linked platforms and includes a new oil and gas pipeline. The Clair Ridge project has …